• West Coast Transit

    Read More
  • Peninsula Road: Construction begins January 23, 2024

    Read More
  • District of Ucluelet Service Requests

    Read More
  • Public Hearings

    Vivamus vitae auctor risus. Duis imperdiet suscipit posuere. Nunc eu ornare nisl.
    Aenean ligula elit, rhoncus ac nulla in, ultrices posuere purus.

    Read More
  • Village Green Revitalization

     

     

    Read More
  • Housing and B&B's

    Read More
  • Ucluelet Tourism Plan

    Read More
  • Ucluelet Flood Mapping Project

    Vivamus vitae auctor risus. Duis imperdiet suscipit posuere. Nunc eu ornare nisl.
    Aenean ligula elit, rhoncus ac nulla in, ultrices posuere purus.

    Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

Welcome to Ucluelet, British Columbia

The Resort Municipality of Ucluelet is situated on the edge of the Wild Pacific Ocean. It offers visitors and residents the opportunity to live in and explore one of the world's most pristine coastlines. A true west coast working harbour, Ucluelet is a place rich in tradition and natural beauty.

Quick Access Links to Our Most Popular Pages

Planning and Building  Council Meeting Agendas  Parks and Rec Activity Guide  Ukee Map  Contact District Office Staff  emergency-preparedness

 

Public Works or Parks Service Requests

Do you see a pothole that needs filled? Is there a storm drain on your street that isn’t draining? Citizens of Ucluelet are encouraged to utilize our online Service Request form to request the attention of our Public Works or Parks teams.

Some other examples of requests for service include garbage on the beach, maintenance required on our trails, streetlights out, or washrooms that need attention. Our Online Service Request form is a great way to let our Team know when something may need attention. Not comfortable submitting an online request? No problem! Reach out to the District Office at 250-726-7744.

If you experience an emergency, such as a fire, flood or an accident, be sure to contact the appropriate emergency authority. Comments, suggestions or complaints are best directed in writing, and can be received in person at the District Office, by mail or by email at info@ucluelet.ca.

CityWide Image

Notice of Personal Information Collection: The personal information on this form is being collected for the purpose of processing your service request, in accordance with section 26(c) of the Freedom of Information and Protection of Privacy Act.
For more information about how this information will be used, please contact the Manager of Corporate Services at 250-726-7744.

UKEE MAIL - Tune in to your Community!

Sign up and get the latest local news and information such as:

  • Community Notices
  • Community Events
  • Parks and Recreation Program Guides
  • Monthly Newsletters
  • Urgent Information Bulletins

Enter your email in the box below.

Please enter a valid email address.

By submitting your email address, you agree to allow the District of Ucluelet to contact you for the purposes providing Ukee Mail communications as listed above. Your email address is collected by the District pursuant to the 26(c) Freedom of Information and Protection of Privacy Act.
The District uses Mailchimp, a third-party email delivery service with servers located in the United States, to facilitate sending you Ukee Mail communications. By submitting your email you agree and consent to your email address being stored and accessed in the United States by Mailchimp for the purposes of facilitating our communication with you. Click here to read Mailchimp's privacy policy.
If you have questions about the collection, use and disclosure of this information by the District please contact Corporate Services at info@ucluelet.ca or 250-726-7744.

Ucluelet Emergency Notification Service

Ucluelet Emergency Network LogoThis service is used to rapidly convey messages to residents and visitors about emergency situations.

Click here to sign up

Community Notices

Please be advised that on Monday May 13 and Tuesday May 14, 2024, between the hours of 6:00 AM and 6:00 PM, the Wild Pacific Trailhead and Coast Guard Station Parking Lot located at the end of...
Please be advised that on Tuesday May 14, 2024, between the hours of 8:00 AM and 4:00 PM, the intersection of Norah Street and Peninsula Road will be closed to regular traffic while crews install...
Notice is hereby given that a Special Committee of the Whole Meeting will be held on May 30, 2024, starting at 4:00 PM.  This meeting will be held in-person in the Activity Room Two in the Ucluelet...
Notice is hereby given that a Special Committee of the Whole Meeting will be held on May 13, 2024, starting at 4:00 PM.  This meeting will be held in-person in Activity Room One in the Ucluelet...

Public Realm Projects

Larch Road Active Transportation Improvements

larch rd

 

 

 

 

 

 

 

Construction Update

Updates for the Week of April 29, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 15, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 8, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 1, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of March 25, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of March 11, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Bowerman Construction Ltd., working on behalf of the District of Ucluelet, will be starting construction of Larch Road Active Transportation Improvements in March 2024 with completion expected by June 10th, 2024.

This project includes upgrades along Larch Road from Matterson Drive to Bay Street, and along Bay Street from Larch Road to Peninsula Road. The focus of these upgrades is to provide continuous and improved cycling and pedestrian routes on the north side of the Larch Road. The completed project will provide a new shared pathway linking Matterson Drive to the improvements on Peninsula Road.

General Considerations

  • During construction stage, Larch Road will become a one-way street with traffic flowing eastbound only while work within the westbound lane and ditch occurs.
  • All roads affected by the works will be made fully passable during non-working hours.
  • All driveways and resident accesses shall be maintained at all times during construction.
  • Travel speeds will be lower in the construction zone.
  • Pedestrians – will be directed to utilise the shoulder of the eastbound lane in order to safely pass the work zone.
  • Cyclists - when present, are to either (1) dismount and utilise the shoulder of the eastbound lane as a pedestrian or (2) take the lane and travel with vehicles.
  • Typical hours of work for this project will be Monday to Friday, 7:00 AM to 5:00 PM (weather & conditions permitting), with work after hours and weekends as required and within the hours of the Districts noise bylaw.
  • Construction noise and vibration should be expected during working hours.
  • If you live in the area and have young children, please advise them of the dangers of construction and the limited visibility of heavy equipment and trucks.
  • All businesses will remain open during construction.

 

Construction Notices

Click here for a copy of the Larch Road Active Transportation Improvements construction startup notice that was delivered to the area surrounding the project site in February 2024.

For more information

Please contact James Macintosh, Director of Engineering
Email: jmacintosh@ucluelet.ca
Telephone: 250-726-7744

Ucluelet Water Capacity and Filtration Improvements Project

 

Proposed District of Ucluelet Water Treatment Upgrades

Details

    • Current Estimate $20,745,400
    • Construction Start: September 2023
    • Construction Completion: October 2026

Background

The District of Ucluelet has experienced decades of water quality challenges. Residents and visitors of the community have concerns ranging from objections of the aesthetics of the often-discoloured water to more serious questions about the potential health impacts of consuming Ucluelet’s water.

Symptoms of Ucluelet’s water quality can be observed at the taps of homes and businesses when the water runs thick and reddish-brown. The taste is unpleasant, and the discolouration is known to leave a residual which stains laundry, dinnerware, bathtubs and sinks. The discolouration in the community’s water appears to increase and decrease without reason and peak with disruptions in the water system – the phenomenon is known locally as “Ukee brown water days.”    

The Problem

Ucluelet’s existing treatment processes and water quality do not meet current regulatory requirements as defined by the Guideline for Canadian Drinking Water Quality. The community’s water sources are high in iron, manganese and turbidity. The necessary addition of chlorine to treat the water for biological contaminants, produces coagulated iron and manganese which builds up in the system, unfiltered by the current treatment technology. Ucluelet’s post-treatment water is consistently testing higher in Manganese, Iron, and turbidity than the regulatory levels require.

The Solution: Water Treatment Upgrade

The proposed water treatment upgrades will treat Ucluelet’s water to within acceptable criteria defined by the Guideline for Canadian Drinking Water Quality as well as increase water storage capacity for estimated District growth.
The estimate scope of work includes the following:

► Upgrade treatment system for Mercantile Creek;
► Upgrade treatment system for Lost Shoe Creek Aquifer;
► Construct a new reservoir.

The Details: Please refer to the project’s Feasibility Study for technical details

      • The proposed water treatment plant at Mercantile Creek is an addition of a single storey building with a footprint of 11m x 9m as well as a 4m x 5m extension for the storage of Clean in Place chemicals and neutralizers.
      • The proposed water treatment at Lost Shoe Creek is an addition of a single storey building with a footprint of 25m x 15m with an internal height of 4.5m with a below grade residuals tank.
      • The proposed Highway Reservoir, which is 1,400m³ will be installed beside the existing Highway Reservoir No.1.

Amphitrite House

The District requires the services of a qualified contractor to undertake construction of a new public amenity building called ("the House"). The House is being developed on the foundation of the former lighthouse residence and the surrounding grounds will provide accessible options to access the house and opportunities for storm watching gathering space for local community and visitors. The District is looking to collaborate with the prime contractor to produce a high quality and constructible design; consequently, the District is seeking innovative recommendations to add value that may influence the cost, schedule and/or long-term maintenance of the project.

Amphitrite House- Drawings

Amphitrite House- RFP

For more information, please contact James MacIntosh, jmacintosh@ucluelet.ca or 250-726-7744

Pages from 2022 06 14 AMPHITRITE HOUSE DRAWINGS

 

Pages from 2022 06 14 AMPHITRITE HOUSE DRAWINGS2

 

Peninsula Road Safety & Revitalization Project

Peninsula Road Project Graphic 4

 Peninsula Road Improvements (Phase 1)

Picture1

 

 

 

 

 

Construction Update

Updates for the Week of April 29, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 22, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 15, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 8, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of April 1, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of March 25, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Updates for the Week of March 11, 2024 - see the latest project updates provided by McElhanney Engineering Company:

Read the Latest Project Update Here

Notice - Intersection Closure at Norah Street and Peninsula Road on Wednesday March 13, 2024. Read Notice Here

Hazelwood Construction Services Inc., working on behalf of the District of Ucluelet, will be starting construction of Peninsula Road Improvements (Phase 1) in January 2024. Phase 1 includes upgrades from Seaplane Base Road to Bay Street. The focus of this first phase of work is to provide continuous and improved cycling and pedestrian routes on the southwest side of the road (opposite the harbour) and storm system replacement between the Sea Plane Base Road and Lyche Road Outfall.

The construction works are expected to be completed in four stages. The general schedule and stages are outlined below:

  • Mobilization: January 23, 2024
  • Stage 1: Sea Plane Base Road to Lyche Road (February 2024 to March 2024)
  • Stage 2: Lyche Road to Lyche Road Outfall (March 2024)
  • Stage 3: Lyche Road to Bay Street (March 2024 to April 2024)
  • Stage 4: Surface Improvements (April 2024 to May 2024)
  • Substantial Completion: May 31, 2024

Click here for a copy of the Phase 1 construction startup notice that was delivered in January 2024:

Peninsula Road Construction Notice - January 2024

* Please note that the schedule provided is subject to change. Circumstances beyond our control or unforeseen conditions may require adjustments to the planned sequencing. Any updates or changes will be communicated.

General Considerations

  • While there will be delays during peak travel times, through traffic will be permitted on Peninsula Road.
    • Traffic will be Single Lane Alternating Traffic (each side taking turns through the construction zone).Picture1
  • Travel speeds will be lower in the construction zone and there will be some restrictions on turning from time to time.
  • Pedestrians - when present, priority is to be given through the site by TCP or qualified personnel.
  • Cyclists - when present, are to either (1) dismount and travel through work zone as pedestrian or (2) take the lane and travel ahead of vehicles when directed by TCP or qualified personnel.
  • Typical hours of work for this project will be Monday to Friday, 7:00 AM to 7:00 PM (weather & conditions permitting), with work after hours and weekends as required.
  • Construction noise and vibration should be expected during working hours.
  • If you live in the area and have young children, please advise them of the dangers of construction and the limited visibility of heavy equipment and trucks.
  • All businesses will remain open during construction.

Public Information Plan

The Public Information Plan identifies actions and procedures for informing the traveling public, project stakeholders, and the District of Ucluelet of current traffic operations and planned changes to traffic operations. Hazelwood plans to use the following plan:

  • The Project Manager will update the Stakeholders with regular emails and phone calls if there is a change to the scheduled work plan
  • Residents & businesses will be given written notice a minimum of 72 hrs prior to when they will be directly affected by Construction Works (including driveway access)
  • The public will be notified via dynamic message boards and DriveBC updates
  • All stakeholders will be given notice before all lane closures and traffic delays / interruptions. Stakeholders to include, but not limited to the following:
    • Local businesses & residents
    • BC Transit
    • Emergency Services

Current Landscaping Plans for Peninsula Road

Click to open:


 

 

 

 

 

 

 

 

Overview

The District of Ucluelet is excited to undertake detailed design for Peninsula Road (the project). This is the next step to advancing the community vision and priorities for this important streetscape and gateway to Ucluelet. The primary aims of this project are to enhance pedestrian, cyclist, and traffic safety for Peninsula Road – while also improving the aesthetic of the streetscape to reflect the local and unique “Ukee” character. This project will upgrade and expand dedicated bicycle routes, improve accessibility, enhance pedestrian safety, improve crossings, enhance traffic and parking safety, and set the framework to beautify 1.4 km of Ucluelet’s key commercial area on Peninsula Road between Forbes Road and Main Street. To provide continuity for the pedestrian and cyclist network, this project also includes design for a multi-use pathway (MUP) for Larch Road (see project area image below).
Due to the magnitude of cost, this project will be implemented in phases. Phase 1, to be tendered in Fall 2023, includes upgrades from Seaplane Base Road to Bay Street. The focus of this first phase of work is to provide continuous and improved cycling and pedestrian routes on the southwest side of the road (opposite the harbour). The upgrades for landscape, furnishings, and custom placemaking elements are limited in this initial phase. Expansion of these elements is a key consideration for future upgrades.

 

Planning for Change

This project is a significant opportunity for our community – it is also a significant change. Change comes will challenges. By working together as a community to identify concerns and challenges we can proactively plan for how to reduce and mitigate impacts. To be successful, we will need to work as a community to come to balanced and realistic solutions. The District and project team is committed to transparency through this important community project and process.

Community & Stakeholder Engagement

A key part of the project is continuing to engage with the community, stakeholders, and interest groups to maintain the District’s commitment to review and feedback opportunities. While we know this project will bring many positive benefits to our community once complete, we also recognize that the road changes and construction process will affect all of those who live, work, or visit our community. We also acknowledge that the project changes and construction will most affect the property owners/business/owners/tenants directly on Peninsula Road. The team will work together to answer how the proposed design responds to challenges, and to plan how we best manage and reduce the impacts of the construction process.

Please check back here for project updates and for opportunities to share your input and comments.

Project Background

Improving Peninsula Road has been a topic of community interest for many years. Driven by community input, the revitalization of the project area has become a priority for the District. Preliminary analysis and design ideas were developed in the 2019 Peninsula Road Streetscape Study and process. The 2019 study reviewed ideas and challenges for the area along with options for enhancing safety, mobility, character, and community values. Community review and feedback from the December 2019 open house shaped the project foundation and key design directions. The project’s aims and terms were then refined through the 2019-2022 Strategic Plan and the policies within the District of Ucluelet’s 2020 Official Community Plan (adopted January, 2022). Based on these community inputs and plans, a Conceptual Design package was developed in 2021 to support a grant funding application. Prior to detailed design development, the first step that kicked off this project was community and stakeholder engagement to gain feedback on the existing Concept Design.

Why Now?

The first phase of this project is possible since the District has secured grant funding, and the Ministry of Transportation and Infrastructure (MOTI) is supporting the storm system replacement and collaborating to align their re-paving of Peninsula Road. Without these opportunities, the District would not be able to fund the Phase 1 scope at present. The alignment of these opportunities is time-sensitive and specific to 2023/2024.

Project Timeline

Project Timeline

Relevant Policies & Approvals

  • OCP Direction: The Official Community Plan (adopted January 2022) identifies Peninsula Road as the gateway and main approach into Ucluelet, a focal point for the District’s image and streetscape character, and a priority for accessibility and active transportation (pedestrian, cycle, and transit service). This document provides the overall guidance for the terms and aims of this project.
  • MOTI Jurisdiction: The portion of Peninsula Road north of Main Street is under the jurisdiction of the BC Ministry of Transportation & Infrastructure (MOTI). Planning and design of this portion of Peninsula Road will require coordination and ultimately approval from the MOTI.
  • District of Ucluelet Mayor & Council: The District of Ucluelet Council reviewed and approved the project terms and award. Council will be involved in milestone reviews through detailed design development as well as the tender award recommendation for construction.

Design Features & Objectives

The previous efforts have outlined key design criteria to be addressed in the detailed design, including, but not limited to:

  • Accessibility: Improve the accessibility of existing crosswalks, sidewalks, and pathways, including adding additional crossings and paths on the northside of the road.
  • Cycling: Develop protected one-way cycle paths in both directions, including improvements to the existing path on the south side. Prioritize separation of the cycle path from vehicle travel lanes to support all ages and abilities (AAA).
  • Pedestrians: Improve walkability including improving sidewalks or paths on the south side and adding or improving pedestrian routes on the north side of Peninsula Road where possible.
  • Traffic Calming: Provide improved safety and a calmed traffic speed that transitions from the highway condition arriving from the northwest. Include curbing extensions at intersections and crosswalks to support traffic calming and provide safety and comfort for pedestrians and cyclists.
  • Intersections: Define intersections that balance the needs of pedestrians, cyclists, and vehicles. Provide curbing extensions for shortened and protected crossings for pedestrians and cyclists.
  • Character & Aesthetics: Go beyond “standard” highway design to enhance the travel experience and character to enhance the unique of Ucluelet. The design approach should build on Ucluelet’s distinct identity and character through furnishings, vegetation, hard landscape materials, and public art opportunities. Where this effort is not possible to address in initial phases it should be addressed with future upgrades.
  • Landscape & Maintenance: Trees, vegetation, and landscape features should support the safety of movement in the streetscape while contributing to the local sense of place. The landscape should enhance the character and comfort of the street while balancing practical, low maintenance needs. Principles of sustainability, water infiltration, and use of native and adaptive species should be used in planting and landscape design.

Click the links below for more information:

Frequently Asked Questions- Peninsula Road

Background & Intro Boards

Conceptual Design Boards

 

For More Information

Please contact James MacIntosh, Director of Engineering